Product Description
Rubber pulley lagging is an important part and component in the belt conveyor system. The rubber pulley lagging can effectively improve the operation of the conveyor system and protect the metal pulley from wear. Diamond or herringbone patterns, rubber-coated surfaces of ceramic rubber sheet , can increase the friction on the surface of the rubber sheet, effectively prevent the sliding friction between the pulley and the belt, reduce belt slippage, and reduce the material adhesion on the surface of the pulley, thereby reducing the deviation and wear of the belt, improving operating efficiency, and making the The drum and the belt run synchronously to ensure the efficient and large-capacity operation of the belt. Widely used in: power plants, coal mines, cement plants, steel, metallurgy, coal, fertilizers, grain depots, ports and other industries.
Product Parameters
Product Name |
Specification(mm) |
Thickness |
Type |
Plat/Diamond Pulley lagging |
1000mmW*10ML |
8mm/10mm/12mm/15mm/20mm/25mm |
Normal/Fire resistant |
Plat/Diamond Pulley lagging |
2000mmW*10ML |
8mm/10mm/12mm/15mm/20mm/25mm |
Normal/Fire resistant |
(Also can be customized according to customer requirements)
Technical data sheet:
Property |
Value |
Hardness (Shore A) |
65+/-5 |
Density (g/cm³) |
1.35/1.3/1.25/1.2/1.15 |
Tensile Strength (MPa) |
6/8/10/12/15 |
Elongation (%) |
250/300/350/400/450 |
Tear Resistance (N/mm) |
25/25/30/30/35 |
Abrasion Resistance at 5N (mm³) |
350/300/250/200/150 |
Compression Set after 22h at 70ºC (%) |
50/45/40/35/30 |
Work Temp (ºC) |
-40 to 90 |
Production show
Product Inspection
We will inspect each batch of goods before shipment and provide customers with inspection reports.
20+ years experience!
Transco focused on transmission belt and conveyor system.
We are committed to: "Connecting everything with Transmission and Science"
Packaging & Shipping
Certifications
FAQ
Q1. Are you a manufactuer?
Yes, we have been selling and producing conveyor belts for more than 20 years!
Q2. What about the lead time?
1) 1--2 days for sample
2) 10~30 days according to order quantity
Q3. How to pay?
1) T/T , L/C,D/P through bank account
2) Select global pay by made in china
Q4. How about package?
1)Roll packing.Outer is packed with one ply water-proof PP fabric
2)We also provide wooden pallets, iron pallets, frame packaging or other customized packaging